How many servers do you want put in a chasis? You migh need to check air flow and all the features. Also, check with dell to manage chasi remotly. I'm not sure about your question. What are the information are you looking for?
The installation of blade server requires following steps.
First you need to Verify that the chassis is tightly secured in the rack. You should have hard drives, extra processors, or cards.Then first pick up the server.On the front of the server should be an ejector lever.One need to open this lever.Slide the blade server in a bay of the chassis. Push it as far as it can go.Then Push the ejector lever. remember that it should lock the blade server in the chassis.Then connect the correct power cables to the power supplies and power sources. Turn on the chassis.After this you can use the blade server's software to configure the system.