Go Back   Data Center, Colocation, Cloud Computing, Storage, Dedicated Servers Forums > General DataCenter Discussion Forum > Data Center Design, Development, Building Systems and Operations

Reply

 

Thread Tools
  #1  
Old 06-21-2013, 02:35 PM
nathanfornash nathanfornash is offline
Junior Member
 
Join Date: Jun 2013
Posts: 1
Default Heat load test

Hi all

I would like to know whether there is a suggested duration for a heat load test to check CRAC conditions? Is a period of a couple of hours enough (in the event the consultant is satisfied with the results on site) or should it go on for longer? This will be tested using a resistive load (halogens)

thanks!
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 11:39 AM.

Member Area



Data Center Industry Daily News


Cloud and Dedicated Hosting


Sponsors Managed Servers Sponsored by DedicatedNOW.
Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.