Default power normalizing question

When we run production serves and when the power goes down UPS will kicked in, after that when would you normalize? Is there a rule? Or Just we can switch it back to the PDU?
Reply With Quote
  #2  
Old 07-04-2009, 08:25 AM
raid raid is offline
Member
 
Join Date: Aug 2005
Posts: 69
Default

I think the question is about when you use a UPS in line interactive mode (power is normally sourced via the STS). When the supply goes out of tolerance, the STS will kick in to run the load from the UPS. So when do you decide to switch it back, is it auto or manual.

This is how I read the question.

If line interactive is fine for you, make it automatic after the supply stays within tolerance for 15 minutes.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 04:19 PM.

Member Area



Data Center Industry Daily News


Cloud and Dedicated Hosting


Sponsors Managed Servers Sponsored by DedicatedNOW.
Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.