I agree. The ideal situation would be 2(N+1); otherwise, when room A is down a UPS and can't carry the full load, room B has no backup in case something fails. Another option might be 2N+1, where an extra UPS is switchable between banks, but I've never actually seen this in practice.
Ken
|