View Single Post

  #1  
Old 06-07-2005, 12:45 PM
kingstos
Guest
 
Posts: n/a
Default datacenter generator testing

Hi, I'm new to the forum and hoping I will be able to give and receive valuable information . I have a question on what the industry standards are for datacenter diesel generator testing. I am wondering how often it should be started and how often for a full load test. I believe we do an annual simulated load test with a load bank and then start generator every 2 weeks and run for 5 minutes. This does not seem sufficient to me and I'm wondering if anyone has a link showing best practice and industry standard that I can use to support my theory. thanks Steve
Reply With Quote