Default Everything about Data Center ?

follow techspec : TIA -942

Tier 1, 2, 3, 4: re-comment Tier 3 plus

Power: 2 source (2PDU)
UPS: N + 1, not need 2N - for backup and save price
Cooling: 2N - If you need 80KW for your DC, you must have 4 PAC 40KW, 40KW + 1 running and 40KW + 1 backup and while one 40KW down u have 2 PAC 40KW backup
Raise floor: only for NOC, Server room and Network Room, not need for M&E room
Fire system: follow Raise Floor, u must design Fire System to The Area.
Cabling running inside Raise Floor: re-comment, not front of PAC flow maybe stop the air-cool flow
etc....

Power calculator: How much Rack, how about power capacity of 1 Rack, lighting, fire alarm, access control
Cooling calculator: follow power calculator and DC area

IBM and Dell, HP, SUN have power calculator

Link:
IBM:IBM System x and BladeCenter Power Configurator
HP: http://h30099.www3.hp.com/configurator/powercalcs.asp
Dell: DCCP Tool of DELL Planning for Energy Requirements with Dell Servers, Storage, and Networking
SUN: Website


Tks
minhn